How to plot with patchwork

[This article was first published on R-exercises, and kindly contributed to R-bloggers]. (You can report issue about the content on this page here)
Want to share your content on R-bloggers? click here if you have a blog, or here if you don't.

INTRODUCTION

The goal of patchwork is to make it simple to combine separate ggplots into the same graphic. As such it tries to solve the same problem as gridExtra::grid.arrange() and cowplot::plot_grid but using an API that incites exploration and iteration.

Installation
You can install patchwork from github with:

# install.packages("devtools") devtools::install_github("thomasp85/patchwork")

The usage of patchwork is simple: just add plots together!

library(ggplot2) library(patchwork) p1 <- ggplot(mtcars) + geom_point(aes(mpg, disp)) p2 <- ggplot(mtcars) + geom_boxplot(aes(gear, disp, group = gear)) p1 + p2

you are of course free to also add the plots together as part of the same plotting operation:

ggplot(mtcars) +
geom_point(aes(mpg, disp)) + ggplot(mtcars) + geom_boxplot(aes(gear, disp, group = gear))

layouts can be specified by adding a plot_layout() call to the assemble. This lets you define the dimensions of the grid and how much space to allocate to the different rows and columns

p1 + p2 + plot_layout(ncol = 1, heights = c(3, 1))

If you need to add a bit of space between your plots you can use plot_spacer() to fill a cell in the grid with nothing

p1 + plot_spacer() + p2

You can make nested plots layout by wrapping part of the plots in parentheses – in these cases the layout is scoped to the different nesting levels

p3 <- ggplot(mtcars) + geom_smooth(aes(disp, qsec)) p4 <- ggplot(mtcars) + geom_bar(aes(carb)) p4 + { p1 + { p2 + p3 + plot_layout(ncol = 1) } } + plot_layout(ncol = 1)

Advanced features
In addition to adding plots and layouts together, patchwork defines some other operators that might be of interest. – will behave like + but put the left and right side in the same nesting level (as opposed to putting the right side into the left sides nesting level). Observe:

p1 + p2 + p3 + plot_layout(ncol = 1)

this is basically the same as without braces (just like standard math arithmetic) – the plots are added sequentially to the same nesting level. Now look:

p1 + p2 - p3 + plot_layout(ncol = 1)

Now p1 + p2 and p3 is on the same level.

Often you are interested in just putting plots besides or on top of each other. patchwork provides both | and / for horizontal and vertical layouts respectively. They can of course be combined for a very readable layout syntax:

(p1 | p2 | p3) / p4

There are two additional operators that are used for a slightly different purpose, namely to reduce code repetition. Consider the case where you want to change the theme for all plots in an assemble. Instead of modifying all plots individually you can use & or * to add elements to all subplots. The two differ in that * will only affect the plots on the current nesting level:

(p1 + (p2 + p3) + p4 + plot_layout(ncol = 1)) * theme_bw()

whereas & will recurse into nested levels:

p1 + (p2 + p3) + p4 + plot_layout(ncol = 1) & theme_bw()

Note that parenthesis is required in the former case due to higher precedence of the * operator. The latter case is the most common so it has deserved the easiest use.

To leave a comment for the author, please follow the link and comment on their blog: R-exercises.

R-bloggers.com offers daily e-mail updates about R news and tutorials about learning R and many other topics. Click here if you're looking to post or find an R/data-science job.
Want to share your content on R-bloggers? click here if you have a blog, or here if you don't.

Never miss an update!
Subscribe to R-bloggers to receive
e-mails with the latest R posts.
(You will not see this message again.)

Click here to close (This popup will not appear again)